
Location
Austin, TX
Schmidt Electric Company provided complete electrical system construction services for a new, 122,000-square-foot manufacturing facility for HelioVolt.
The manufacturing process layout was not completely designed by the time construction started, so a flexible design was required. The project featured:
Building amenities included 30,000 square feet of administrative and engineering office spaces, as well as a showroom and training, meeting, and lunchrooms. The completed facility was built for the design and manufacture of thin film solar photovoltaic modules.